Lumina: photoreal visualisation of the arrival, house, pool and water tank above the Rio Verde valley

Off-Grid Homestead Design

€4.800,00
Skip to product information
Lumina: photoreal visualisation of the arrival, house, pool and water tank above the Rio Verde valley

Off-Grid Homestead Design

€4.800,00

A complete design for a property built to run on its own — water, power, food and shelter planned to work together. We visit for 2–3 days to evaluate your land's actual resources, then draw a full layout that integrates growing space, water catchment and systems, energy infrastructure zones and structure placement for daily livability and resilience.

What you get

  • 2–3 day on-site visit: full resource assessment (water sources, sun exposure, terrain, access)
  • Complete land layout: growing systems, water and power infrastructure zones, structure orientation
  • Material and systems recommendations suited to your region
  • A design intended to guide contractors during build-out

How it works

  1. Check out here.
  2. We email you to confirm the visit dates and collect photos, measurements and anything you already know about your water and power.
  3. After the visit we draw the layout and send the systems and materials recommendations with it.

See it done

The Lumina irrigation and water plan, lighting and power plan and seven-stage construction phasing plan show how we draw the systems that make a property run. See the drawing set and documents →

You may also like